24 November 2011

Ready for the finishing stages

I am varnshing the wooden pads, book shelves and strips with Tonkinois varnish, which is taking an age to dry in this humid cold weather, so it will be a long job. I have fiddled and got the wiring from the switch box ready to connect to the navigation lights. I have bored new holes through the second flat fender and cut the ropes to length, so I can hang them very quickly off small cleats on the inside of the coamings. And I have ordered the navigation lights and topsides paint from Piplers in Poole. I think I know how I will run the light wires around, and will start on it over the weekend. I can't do any painitng until Ihave given the boat a thorough clean as she is filthy.

No comments:

Post a Comment